top of page
MAP Japan-Taiwan.jpg

Integrated Transportation Model Case Study (Taiwan Edition)

Japan.jpg
Taiwan.jpg

Target device

Semiconductor manufacturing equipment / LCD manufacturing equipment / Precision machinery / Others

Chassis and container only exported / Chassis and container towed by an air suspension trailer on the Taiwanese side.

*

Air conditioning and air suspension specified

Customer (Japan)

Customer (Japan)

Hakata Port

Hakata Port

Kaohsiung Port

Kaohsiung Port

Customer (Taiwan)

Customer (Taiwan)

13-1.png
13-2.png
13-3.png
13-4.png

Integrated transport example (Japan to Taiwan)

《Estimated Shortest Schedule》

Depending on customs clearance and move-in conditions. *Carrier is assumed to be Ryukyu Kaiun.

14-1lb.png

Integrated transport example (Taiwan ⇒ Japan)

15-1lb.png

Integrated Transportation Examples (Reference Material)

16-1.jpg

Japan Hakata ⇒ Taiwan Kaohsiung route

16-2.jpg

When boarding at Hakata Port, Japan

16-3.jpg
16-4.jpg
16-5.jpg
16-6.jpg

Disembarking from Kaohsiung Port, Taiwan

Boarding and disembarking

boarding

disembarkation

bottom of page